What started in 1894 as a private boarding school with only 16 boys enrolled is now a thriving educational institution with an all-new facility to support its expanding student population.
The Grace Church School now features an entirely new third floor with additional classroom, performing arts, and laboratory spaces. The 25,000-square-foot project also includes an impressive overbuild for the school’s gymnasium expansion, which required lifting and installing massive steel support pieces by crane.
The entire construction and fit-out process was completed off-hours to avoid impacting the students’ daily schedules, including a new roof that matches the school’s existing exterior and upgraded mechanical and electrical systems. This was possible thanks to our meticulous pre-construction phase and ongoing attention to detail.
![](https://archsb.com/wp-content/uploads/2021/11/19C3012.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3013-1.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3019.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3020.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3027.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3032-1.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3038.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3041.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3052.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3064.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3069.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3073.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3074.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3078.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3087-1.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3094-1.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3100.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3107.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3110.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3119-1.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3135.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3139.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3155.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3163.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3166.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3173.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3180.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3188.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3201.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3209.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3210.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3211.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3219.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3220.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3230.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3239.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3240.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3248.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3255.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3265.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3271.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3278-1.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3282-1.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3299.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3309.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3324.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/19C3327.jpeg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Commons-AltView-scaled.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Commons-Students-scaled.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Golf-Simulator-scaled.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Gym_Mezzanine-scaled.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Gym-Basketball-scaled.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Gym-Cheerleaders-scaled.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Gym-Empty-scaled.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Stairwell-Empty-scaled.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Stairwell-Skylight-scaled.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/GCHS-Stairwell-Students-scaled.jpg)