Nearly doubling the square footage of the long-standing St. Luke’s School, our team completed a two-story, steel frame overbuild to accommodate the K-8 school’s growing student population. As with most New York City expansion projects, we had to build up not out, which required carefully considered designs and additional pre-construction planning.
This newly configured educational facility includes nine new classrooms, an expanded 4,500-square-foot multipurpose performance space, and an ADA-compliant elevator and bathrooms.
To avoid compromising the existing building structure, our team built this entire add-on on six steel columns that intersect with but never touch the original formation. We were able to complete the expansion without the school having to displace students or cancel a single instructional day.
![](https://archsb.com/wp-content/uploads/2021/11/Bartle_StLuc01A.png)
![](https://archsb.com/wp-content/uploads/2021/11/Bartle_StLuc_white.png)
![](https://archsb.com/wp-content/uploads/2021/11/Bartle_StLuc_BluClss.png)
![](https://archsb.com/wp-content/uploads/2021/11/Bartle_StLuc0141A.png)
![](https://archsb.com/wp-content/uploads/2021/11/Bartle_StLuc0132.png)
![](https://archsb.com/wp-content/uploads/2021/11/Bartle_StLucTwilightB.png)
![](https://archsb.com/wp-content/uploads/2021/11/Bartle_StLuc0269.png)
![](https://archsb.com/wp-content/uploads/2021/11/Bartle_StLuc_overall-frm-North.png)
![](https://archsb.com/wp-content/uploads/2021/11/DSC_0734.png)
![](https://archsb.com/wp-content/uploads/2021/11/DSC_0728.png)
![](https://archsb.com/wp-content/uploads/2021/11/DSC_0721.png)
![](https://archsb.com/wp-content/uploads/2021/11/DSC_0687.png)
![](https://archsb.com/wp-content/uploads/2021/11/DSC_0689.png)
![](https://archsb.com/wp-content/uploads/2021/11/DSC_0712.png)
![](https://archsb.com/wp-content/uploads/2021/11/DSC_0695-1.png)
![](https://archsb.com/wp-content/uploads/2021/11/st_lukes_school_roof_10_18_22__0470.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/st_lukes_school_roof_10_18_22__0310.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/st_lukes_school_roof_10_18_22__0370.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/st_lukes_school_roof_10_18_22__0405.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/st_lukes_school_roof_10_18_22__0320.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/st_lukes_school_roof_10_18_22__0285.jpg)
![](https://archsb.com/wp-content/uploads/2021/11/st_lukes_school_roof_10_18_22__0410.jpg)